Construction and Infrastructure– category –
-
Construction and Infrastructure
Yumeshima IR Ground Risk: ¥78.8B Remediation Plan and Transparency Debate
-
Construction and Infrastructure
Flash Flooding at Yumeshima Exposes Drainage Gaps Ahead of IR Development
-
Construction and Infrastructure
Osaka Launches RFP for Yumeshima Memorial Park Zone Master Planning, Including 200m EXPO Ring
-
Construction and Infrastructure
Osaka Port Authority Selects Consultant for Yumeshima Pedestrian Deck Master Plan
-
Construction and Infrastructure
Osaka Redevelopment Accelerates on Multiple Fronts: Morinomiya New Station Set for 2028
-
Construction and Infrastructure
Osaka to Launch RFP for 42-ha Post-Expo Yumeshima Zone 2 in Late June 2026
-
Construction and Infrastructure
JR Sakurajima Line Yumeshima Extension Targets Late 2030s, Leaving IR Opening Gap
-
Construction and Infrastructure
Osaka IR: Employee Housing Next as Orix Executive Signals Construction on Track
-
Construction and Infrastructure
JR West Launches Study Group with Osaka on Rail Extension to Yumeshima IR Site
-
Construction and Infrastructure
Keihan Rail Extension to Yumeshima Unlikely Before 2034, Four Years After IR Opening
12

